top of page
Dams Algeria

The work was coordinated by Ruhr-Wasserwirtschafts-Gesellschaft mbH, Essen, which also examined the current condition of the dam walls and the geological conditions at the dam sites.
Project description
For two dams (Beni-Bahdel and Meffrouch), which were built in Algeria in the 1930s and 1960s as reinforced concrete arch dams, stability analyses were performed for various load combinations consisting of static loads, operational and extreme loads, and seismic loads.

The work was coordinated by Ruhr-Wasserwirtschafts-Gesellschaft mbH, Essen, which also examined the current condition of the dam walls and the geological conditions at the dam sites.
bottom of page
